The straight answer first, because it reads better here than three emails into an estimate: we have not delivered a project inside Brevard County yet. What we have built sits about an hour inland, in Orange and Polk counties. This page exists because Melbourne is an address we quote and drive to, not because we are claiming work on the Space Coast. Brevard is also outside the five counties we cover without a travel charge, so the drive is quoted into the estimate rather than absorbed — better read now than found in a number later.
What a storm takes off a property here is mostly what we build: fence panels and the posts holding them, screen mesh and the frames it is stretched on, coating that was already thin at a window return, and sealant joints that were due years ago and only announced it under wind-driven water. None of that is structural work — we do not take structural repairs, and we say so before an estimate rather than after. All of it is work where the failure started before the storm did, which is also why a fence set plumb and a joint renewed on time usually come through one.
A screen enclosure on this coast is not the same structure as one inland. Florida's building code sets the wind load the frame has to carry from a map, by address, and the coast raises it: the code treats a site as a wind-borne debris region within a mile of the coastal mean high water line where the ultimate design wind speed is 130 mph or more, and anywhere that speed reaches 140 mph. Which figure governs a given lot comes off the code map for that address and the engineer's drawing, not off a rule of thumb, and a beachside address normally reads higher than a mainland one. The drawing, the submittal and the inspection are inside the scope when we quote an enclosure; they are not an extra that appears later.
Where the permit goes depends on the address, and a Melbourne mailing address is not proof of a Melbourne jurisdiction. Inside the city limits, building permits go through the Building Section of the City of Melbourne's Code Compliance Division. West Melbourne, Palm Bay, Melbourne Beach, Indialantic and Satellite Beach each issue their own. Unincorporated property goes to Brevard County Planning and Development. A fence needs a permit either way, and if the property sits in one of the city's redevelopment areas an exterior change — a paint color included — can need the Architectural Review Board before a single item is ordered. That is the first thing we settle, because it moves the calendar and not the work.
One more thing worth saying plainly on a page about storm work, because this is the season when somebody knocks on a door with a truck and a clipboard: we do not hold a contractor's licence, and we only take the scopes that do not require one. We work as general services, or as a subcontractor to a licensed general contractor, and a scope that does require a licence goes to an ally who holds it for that trade. The permit is pulled in the name of whoever holds the licence for it — the owner, or the licensed contractor on the job. Ask the same question of anybody else who turns up this month.
Orange County is the home county nearest to Melbourne, and the Orlando page carries most of what we have built.