CHALLENGE
A veterinary practice opening on a fixed date, with front-of-house finishes, branding and exam areas all landing inside the same two weeks.
SOLUTION
Partition framing, corridor, doors and hardware run in parallel with finishes; the branded feature wall and reception built last so they stayed clean for opening day.
RESULT
Practice handed over ready to receive patients on the date that was set.